New Construction Delivery Methods – Public-Private Partnerships (P3)
March 5, 2014
In my last two posts, I described the new design-build and design-build bridging construction delivery methods authorized by the General Assembly during the 2013 legislative session. This post completes our discussion of the new delivery methods by outlining the third … Read more